Important Attributes
AIM: renovate old Pre-School Building (old TOSHC building) and resurrect compliant TOSHC space for 45 primary school age children.
PURPOSE: in 2021, the TOSHC aplication for 135 children in the school hall was approved, a capacity increase from 105 to 135 children. The new TOSHC building (105 capacity) and a rejuvenated Pre-School building (45 capacity) will enable TOSHC to service 150 children in total.
CAMPUS: lower campus.
ADDRESS: 105 Sylvan Road, Toowong QLD 4066.
LOCATION: original Pre-School building (the old TOSHC).
PROJECT MANAGER: Department of Education, Education Queensland in association with Toowong State School and the Toowong State School Parents and Citizens Association (P&C).
BUDGET: guesstimate $400K-$500K
COMPLETION: guesstimate July 2021 (school holidays)
Floor Plans - August 2020
Thanks to Selina Chu for creating the floor plans. Selina invested a massive amount of her personal time attending meetings, participating in numerous chats, listening and sythesising ideas.
- Click to view 20200815-OLD TOSHC.pdf
- Click to view 220200828-REVISED FLOOR PLAN.pdf
Additional Ideas - February 2021
Thanks to our TOSHC Manager (Tracy) for submitting these additional considerations and suggestions.
- With both the lower oval hall (new TOSHC bulding) and the old TOSHC building - this should provide adequate indoor space - pending if calculations are based on the new proposed plan designed with Selina or the current layout.
- If the current layout of TOSHC provides us with inside space of 42 this will get us to 135, if it somewhere around the 30 - 40 figure this would also work as the number does not have to equal 15 each time we increase.
- Will they provide us with a cost of either way? Doing the minimum to get in vs doing the dream? If not - My thoughts are to proceed with the current layout, its functional and previously worked. Everything is open and provides clear supervision.
- Update the necessities - new kitchen in back room, remove yellow kitchen, remove asbestos.
- Leave back storage room and chemical cupboard as we really do need this space to function and keep everything well stored, clean and safe from hazards.
- Update office with new desks place floor to roof lockable cupboards for office confidentiality (this also allows me to see across both sites).
- Repaint, new flooring, update toilets to maintain children's dignity.
- Keeping the costs lower on the building will also allow us to put in an outdoor space with hand ball courts, a basketball net, a cricket pitch, soccer goals and other EQ approved facilities that are appropriate for all age groups to engage in.